What You Need to Quote a Metal Building Without Errors
By Facundo Campo, 3D quoting tool developer
In short: To quote a metal building without errors, the sales rep needs nine things before the first number: dimensions (span, length and eave height), use, site and access, roof type, walls, openings, floor, delivery and erection, and lead time; a 3D configurator gathers them into one configuration shared by link.
To quote a metal building without errors, the rep needs nine things settled before the first number goes out: the dimensions (span, length and eave height), the use, the site and access, the roof type, the walls, the openings, the floor, delivery and erection, and the lead time. Almost every metal building quote that goes wrong has one of those assumed instead of asked.
This checklist is for the sales rep at a metal building company, or the owner who still quotes everything personally. It's not what a manufacturer needs to commission software (that's what you need for a 3D quoting tool), and it's not the review of the costliest mistakes at any factory (that's costly quoting mistakes). It's what you have to ask the customer who wants a building.
1. Dimensions: span, length and eave height
These three define everything else. Span is the clear width the roof crosses, length sets how many frames there are, and eave height is how tall the walls are where the roof starts.
The classic mistake is quoting "a 50 by 100" without pinning down whether those are outside or inside dimensions, or the height. For a machinery building, ask about eave height with the tallest machine in mind: if the combine doesn't fit afterward, no quote can fix that.
2. Use: what's going inside
The use decides things the customer doesn't ask for but needs. A storage building and a shop at the same size don't get the same walls, floor or doors. Asking "what will you use it for?" before "what size do you want?" saves you the second round.
- Machinery: height, a wide door, an open front or no floor.
- Storage or warehouse: enclosed, concrete floor, a door for the truck.
- Shop: enclosed, daylight, a walk door, concrete floor.
- Livestock: ventilation, half-height walls, the right floor.
3. Site and access
Where the building goes changes the quote even if the building is identical:
- Location: the town or the farm, for delivery and for the crew.
- Access: whether a truck with the steel can get in, whether there's a dirt road, whether a crane can be used.
- Ground: whether it's level, whether it needs site work, or whether there's already a slab.
- Surroundings: whether the building goes against a wall or a property line, which often decides the roof.
Soil conditions, local wind and snow requirements and what the building department asks for are assessed by the fabricator's engineer; the rep just has to record the data so nobody assumes it.
4. Roof: type, pitch and color
Gable, single-slope or curved; the pitch; the eave overhang; the color of the sheets and the trim. The differences between the three, ready to show a customer, are in metal building roof styles.
The usual error here is in the finishing: a ridge cap and trim the customer assumes are included and the quote doesn't have, or a sheet color that isn't in stock.
5. Walls: open, half-height or enclosed
Side walls open, half-height, fully clad in metal or over a block or brick base; front and back open or enclosed, each on its own. After size, it's the choice that moves the quote most, and it's best decided by seeing it. I go through each option in open-sided vs enclosed metal building.
6. Openings: main door, walk door and windows
- Main door: how many, where, how wide and tall, sliding or another type.
- Walk door: whether there is one and where.
- Side windows: how many and how high.
Ask about door width and height with the biggest vehicle that'll go through it in mind. A door sized from memory is one of those mistakes you find out about late, once the building is up.
7. The floor
No floor, concrete, wood or rubber, and who's doing it: many fabricators don't pour the slab and leave it to the customer or a concrete contractor. If the quote doesn't say so, the customer assumes it's included.
8. Delivery and erection
Whether the price is at the factory, delivered or erected; how delivery is charged by distance; whether the crew travels and who covers lodging on far-away jobs. Delivery is the line that gets forgotten most, and on a large building it weighs a lot. How to calculate it by distance instead of by eye is in calculating delivery in the quote.
9. Lead time
When the customer needs it and what lead time the fabricator can commit to. Lead time affects price when steel has to be bought at today's prices, and a quote with no validity date is an open-ended promise.
Getting it all into one configuration
I'm Facundo Campo, and I build 3D quoting tools and configurators for manufacturers. You can keep the list above on paper, but it still depends on the rep asking everything. In a configurator, the data is the building itself: dimensions, roof, walls, openings and floor are picked in the panel and shown in 3D, so whatever's missing is obvious.
In the metal building 3D configurator, the Share button creates a link that opens exactly that configuration. The customer sends it over WhatsApp or text, the rep opens it and quotes the same building the customer saw, without reinterpreting a phone call. I cover it in sharing a configuration by link, and every option is in the metal building configurator guide.
A custom build adds the rest: the location for delivery, the use as a question in the wizard, the price calculated from the fabricator's table and a PDF quote with a view of the building. If you want your metal building quotes organized this way, message me on WhatsApp or by email.
Frequently asked questions
What dimensions do I need to get a metal building quote?
Span (width), length and eave height. Make clear whether they're inside or outside dimensions, and think about height in terms of the tallest thing going in.
Why do two quotes for the same building differ so much?
Usually because they're not quoting the same thing: one includes delivery, erection, trim or the slab and the other doesn't, or they assume different heights or walls. Comparing them against the same checklist clears it up.
Does the metal building configurator produce the quote?
The public configurator doesn't show prices: it gathers the configuration and shares it by link. In a custom quoting tool, that same configuration is priced with the fabricator's rules and prices.
What gets forgotten most when quoting a metal building?
Delivery and erection are among the most forgotten lines, along with the slab and the trim. Customers assume they're included if the quote doesn't say otherwise.
